P1027 Aircraft Maintenance Hangar and Airfield Improv

Location
Norfolk Naval Base
Size
Not Provided
Delivery Method
Design Bid Build
Due Date
5/26/2023 12:00:00 PM
Architect
Clark Nexsen
Last Addendum Date
2/8/2023 12:00:00 AM
PROJECT DESCRIPTION

The P-1027 project constructs a modified Type II Maintenance Hangar consisting of approximately 78,000 gross square feet, designed to meet the specific mission requirements of the CMV-22B airframe. Hangar spaces for a new CMV-22B are generally limited to the LP Area of Naval Station Norfolk (NSN). In this area, five hangars exist, all facing south in front of a large concrete area reserved for aircraft aprons. A maximum gap of approximately 390 ft. separates LP48 east wall and LP33 west wall where the new hangar will be located. Civil work includes the demolition of the existing concrete pavement within the footprint of the hangar site, removing abandoned utilities, constructing the foundation for the hangar, relocating telecom ductbank and other utilities, and stormwater management. The airfield paving for this project consists of the reconstruction of the aircraft parking apron and widening of the shoulders for taxiways A and C (North) to support of the VRM-40 squadron.

This is a confidential project! If you need access to the bid documents, please contact Candy Hennig for access. Send Email

Western Area Middle School Construction

Location
18100 Duval Road, Moseley, Virginia
Delivery Method
Design Bid Build
Architect
RRMM
Size
250,000
Due Date
3/28/2023 12:00:00 PM
Owner
Chesterfield County
RFI Date
3/16/2023
Contact
CHennig@sbballard.com
PROJECT DESCRIPTION

Construction of a new three (3) story middle school building totaling approximately 250,000 square feet including site development, mechanical, electrical, plumbing, fire protection, interior build-out, and finishes.

Open Plan Room

F22 Training Support Squadron Facility

Location
Langley Air Force Hampton VA
Delivery Method
Design Bid Build
Architect
RS&H
Size
70,500
Due Date
4/10/2023 12:00:00 PM
Owner
US Air Force
RFI Date
3/30/2023
Contact
CHennig@sbballard.com
PROJECT DESCRIPTION

This project will provide a 70,500 square-foot, eight-bay Training Support Squadron Facility (TRSS-F) to support additional F- 22A flight crews from the Tyndall Air Force Base. Construction includes compacted fill above the 100-year flood plain, reinforced concrete foundations, concrete floor slab, structural steel frame with concrete masonry unit facade, and standing seam metal roof. The facility will provide all necessary spaces to house academic (classroom) and equipment (simulator) instruction, equipment/computer support, staff space, restrooms, briefing rooms, and building systems support. Construction also incorporates a Sensitive Compartmented Information Facility (SCIF) that must be constructed in accordance with National Counterintelligence and Security Center IC Tech Spec - for ICD/ICS 705. The project includes all utilities, site improvements, detection/protection features, security enhancements and other supporting work necessary to make a complete and useable facility. The facility must be able to withstand seismic and wind effects as prescribed in applicable codes and design guides. Utilities to include the development and support to long-run outside plant communications. The project also includes emergency generators, site improvements, special foundations above mean high tide sea level, parking, and all necessary supporting facilities.

Open Plan Room

Eastern Shore Warehouse PEMB

Location
Delivery Method
Architect
Size
Owner
Contact
CHennig@sbballard.com
PROJECT DESCRIPTION

Open Plan Room

JMU Village Housing Construction Outreach Meeting

Location
James Madison University Parking will be provided for your guests in Lots C12, D3, and R4. Parking permits are not required.
Delivery Method
Architect
Moseley and Niles Bolton
Size
Owner
James Madison University
Contact
CHennig@sbballard.com
PROJECT DESCRIPTION

SB Ballard Construction will be holding a project INFORMATIONAL MEETING for the JMU Village Housing Phase 1 Project on Thursday April 6, 2023 at 1:00 PM. The Village Housing project will consist of a five story housing project on JMU's campus with demolition and sitework

Open Plan Room